苏州某钢铁厂顶升平移项目
发布时间: 2015-10-29 14:34:51


    苏州某公司锌铝锅顶升平移项目,是拆除到了使用年限的旧锅,安装新的锌铝锅的顶升平移项目。
    项目使用了曼理公司的滚轮和泵,曼理的多出口泵,特别适用于顶升平移项目,以它为核心部件做成的液压站,是这个项目顺利完工的核心控制设备。曼理多出口泵在每个出口都有一个单独的球阀,使得一个泵相当于多个泵,简化了同步运动的回路设计,该泵的流量精度高于分流阀。
    为了配合锌铝锅项目,特别委托第三方公司定制了钢结构,和现场的安装施工。施工期间,24小时连续施工,保证了客户旧锅换新锅的顺利准时完工,得到了客户的好评。
    Suzhou  zinc aluminum pot jacking & translation project's role is to remove nearly expired pot and install a new pot.
    The project use Marlin products Roller and  pump. MARLIN split pump is very suitable for jacking & translation project, a hydraulic station based on Dynex pump is the key control device for this project which guarantees the project accomplished well. MARLIN split pump has a seperate ball valve on each outlet port,which makes one split pump works as multi-pumps, it simplizes synchronous move circuit design, MARLIN pump's flow accuracy is higher than split valve.
    To fulfill this project Marlin assigns third party to make steel structure and deal with site installation. For site installation, take 24 hours continuous construction which assures customer's old pot removal and new pot installation finish on time and get customer's praise.


         